![]() ![]() ![]() Now stack 2 inner uprights and drill 3- 3/16” holes near notch. Take 2 pieces stack and drill 12mm holes where indicated right through.ĭrill ½” bearing holes to a depth of 7/32” keeping in mind you have a left and right piece.Ĭut out notch on inner uprights also keeping in mind you have a left and right side. Turn over and fit in base drill 1/8” clearance holes and fasten with 5/8” #8 screws.Ĭut 4 uprights rectangular for now we can cut angles after drilling is completed. Now you can stack the front and back and drill through with 3/16” where indicated.And finally drill through with 3/8” to center of ½” hole.Drill 1/8” holes to a depth of ¼”. Take other 12 ¼ “ and drill to a depth of 7/32” as well till the ½’ bearing fits is just below the surface. Take one 12 ¼” piece and drill ½” hole where indicated to a depth of 7/32” Take 3/16” brad point bit drill through front and back pieces just enough to mark centers on sides and then take 1/8” brad point bit and continue to drill to a depth of an 1”.Assemble with 1” number 8 screws.ĭrilling and assembling outside perimeter base : Stack and drill 2- 11 ½” pieces drill 5/16 center hole through both piecesĭrill remaining 3/16” holes around perimeter through both piecesĪssemble pieces as shown in picture keeping 3/16” holes to top. Stack and drill 2 - 12 ¼” pieces as per drawing right through with a 3/16 bit ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |